Choose milestones with a purpose
Repeated capture is most useful when each visit answers a defined question. A project may need a baseline, a record of an agreed construction phase and a handover walkthrough. Discuss the sequence with the project team so appointments align with actual site progress.
Avoid promising a fixed capture date without considering access and safety. The site lead should confirm when the relevant spaces are available. Explain which conditions need to be visible, especially if later work will cover or change them.
Keep the sequence comparable
Use a stable naming convention and record the capture date for every milestone. Keep a short scope note with each model, including areas that could not be accessed. Where practical, use a consistent coverage plan so reviewers can orient themselves across the sequence.
Give reviewers a clear index of the captures. A project folder full of unlabeled links makes it easy to open the wrong stage. Link each record to the milestone or meeting where it will be used, and identify the person who approves it for sharing.
Use the record with the project’s other evidence
A digital walkthrough can support a discussion of visible progress, but it does not replace inspections, specialist tests or required construction records. Use it alongside the drawings, photographs and documents the project requires.
At handover, agree who will keep access to each model and for how long. Distinguish the final capture from earlier stages, and review the sharing settings before distributing links to a broader group. Clear dates, ownership and access make the collection easier to use after the original team moves on.